PESCO Solar Calculator: Peshawar & KP Net-Billing Payback
Customized for Peshawar Electric Supply Company (PESCO) consumers across Peshawar, Mardan, and Khyber Pakhtunkhwa.
Electricity Usage
Enter bill, drag slider, or tap a quick preset
Rooftop Structure Type
Grid Meter Phase
Night AC Battery Storage
Run inverter AC during night loadshedding
Recommended System Architecture
Calibrated for Tier-1 580W N-Type Bifacial TOPCon Modules
Optimal for continuous AC loads. 4,000+ deep cycle lifespan (approx. 10 years).
Financial Returns & Net-Billing Payback
2026 NEPRA MODELIf hybrid storage exceeds your upfront budget, install a smaller daytime system without night batteries:
*Skips expensive batteries. Runs your household and ACs on solar during the day, dropping your grid consumption below 200 units to qualify for base tariff slabs.
Contractor Quotation Validator
Have a quote from a local installer? Verify if you're being overcharged.
Solar Energy Adoption across Peshawar & Khyber Pakhtunkhwa
In Khyber Pakhtunkhwa, hybrid solar systems provide two indispensable benefits: slashing high NEPRA progressive electricity bills and providing complete independence from unpredictable grid outages.
Explore Regional DISCOs
Explore Solar Sizing Guides & Cost Breakdowns (Pakistan 2026)
Detailed engineering specs, monthly unit yields, 580W panel counts, and turnkey cost breakdowns by system capacity:
5–6 Marla homes running fans, lights, fridge, & 1 inverter AC. ~350–420 units/mo.
10 Marla homes running 2 Inverter ACs + household load. ~600–750 units/mo.
1 Kanal residences with 3–4 ACs & net-metering. ~1,250–1,500 units/mo.
Commercial plazas, schools, clinics, & large joint families. ~2,000–3,000+ units/mo.
Frequently Asked Questions (Solar Sizing & NEPRA Tariffs)
What is the solar insolation in Peshawar under PESCO?
Peshawar averages approximately 4.9 Peak Sun Hours (PSH) per day, with clear skies from March through October providing dependable power generation.
Why is hybrid battery backup recommended in PESCO region?
Due to frequent feeder loadshedding in suburban Peshawar and KP circles, hybrid systems with LiFePO4 batteries ensure 24/7 uninterrupted power for ACs, fans, and refrigeration.
What are the net-metering requirements under PESCO?
PESCO processes net-metering applications for 3-phase consumers through its regional revenue offices, requiring AEDB engineer approval.