Independent Solar Engineering Engine • Zero Contractor Bias

Solar System & Electricity Bill Calculator

Estimate your required solar capacity, panel count, roof space, and battery storage based on active NEPRA progressive tariffs.

5.4 Peak Sun Hours / Day Coastal haze • High year-round sun

Electricity Usage

Enter bill, drag slider, or tap a quick preset

STEP 1
Rs.
Quick Presets:
Estimated Grid Units: ~780 units
Don't have your bill handy?

Rooftop Structure Type

Grid Meter Phase

Night AC Battery Storage

Run inverter AC during night loadshedding

1 AC
8 Hours
2026 Solar Impact Audit
-87% Bill Drop
Current Utility Bill
Rs. 48,000
Progressive tariff slabs
New Post-Solar Bill
Rs. 6,200
Residual grid charges
Monthly Net Cash Kept In Pocket: +Rs. 41,800 / month

Recommended System Architecture

Calibrated for Tier-1 580W N-Type Bifacial TOPCon Modules

ENGINEERING SPEC
Solar Array Capacity
6.4 kW
Rated DC capacity
580W Panel Count
11 Panels
580W Bifacial TOPCon
Inverter Sizing
6 kW Hybrid
48V Pure Sine Wave
Required Roof Space
308 sq ft (~1.4 Marla)
Clear unshaded south/south-west exposure
Structure Rating
12-Gauge Galvanized
130 km/h wind certified
Night AC Battery Bank: 2x 5.12 kWh LiFePO4 (51.2V 100Ah)

Optimal for continuous AC loads. 4,000+ deep cycle lifespan (approx. 10 years).

Financial Returns & Net-Billing Payback

2026 NEPRA MODEL
Estimated Turnkey Capex
Rs. 9.5L – 10.7L
Tier-1 Hardware & Labor
Monthly Savings
Rs. 46,947 / mo
Slab avoidance
Payback Period
~1.8 Years
55% annual ROI
5-Year Net Profit
Rs. 18.0 Lakhs
Cumulative net savings
2026 Net-Billing Energy & Tariff Balance
Solar Self-Consumption
~35% Solar Offset
Displaces top progressive retail slabs
Grid Export Credit (NAEPP)
~533 units (Rs. 11,460)
Wholesale credit @ Rs. 21.50/kWh
Net Post-Solar Bill
Rs. 15,977 / mo
Residual bill to local utility
2026 Net-Billing Calibrated: Direct daytime consumption immediately displaces top progressive slabs (~Rs. 45-60/kWh). Exported daytime solar is credited at the wholesale NAEPP rate (~Rs. 21.50/kWh), protecting payback horizons.
Budget Alternative: Daytime "Slab-Breaker" Setup 55% Lower Capex

If hybrid storage exceeds your upfront budget, install a smaller daytime system without night batteries:

Array Sizing
3.5 kW (6 panels)
Estimated Capex
Rs. 4.1L – 4.6L
Monthly Savings
Rs. 29,170 / mo

*Skips expensive batteries. Runs your household and ACs on solar during the day, dropping your grid consumption below 200 units to qualify for base tariff slabs.

Contractor Quotation Validator

Have a quote from a local installer? Verify if you're being overcharged.

BS DETECTOR

Independent Solar Engineering Audit for Pakistani Homes & Commercial Plazas

With electricity tariffs in Pakistan crossing Rs. 60 per unit in upper progressive slabs, solar energy has transitioned from an elective amenity to a vital financial safeguard. SOLARAUDIT.ONLINE was engineered to provide transparent, un-gated mathematical audits free from contractor sales bias.

Regional Grid Utility Calculations & Dedicated DISCO Audits

Every distribution company in Pakistan operates under distinct solar insolation profiles and local load constraints. Audit your exact utility tariff:

Frequently Asked Questions (Solar Sizing & NEPRA Tariffs)

How many units does 1 kW solar produce per day in Pakistan?

Across major Pakistani urban centers (Karachi, Lahore, Islamabad, Multan), 1 kW of installed solar capacity yields approximately 3.8 to 4.2 usable kilowatt-hours (units) per day after applying a realistic 0.78 system derating factor for high summer temperatures and airborne dust deposition.

Can I install solar net-metering on a single-phase electricity meter in Pakistan?

No. NEPRA distributed generation regulations strictly require a 3-phase bidirectional green meter for net-metering. Single-phase consumers must apply to their local DISCO (such as K-Electric, LESCO, IESCO, or MEPCO) for a Phase Conversion and Sanctioned Load Extension before their net-metering application can be processed.

What is a fair price per watt for residential solar systems in Pakistan in 2026?

Based on current wholesale hardware benchmarks, turnkey on-grid residential solar installations typically range between Rs. 75 and Rs. 95 per watt. Turnkey hybrid installations (including 48V LiFePO4 battery storage) range between Rs. 105 and Rs. 135 per watt. Quotes exceeding Rs. 150/W indicate excessive contractor markup, while quotes under Rs. 95/W for hybrid systems indicate compromised hardware quality.

How does the 2026 NEPRA Net-Billing policy affect solar payback periods?

Under NEPRA's Net-Billing regime, exported units are credited at the National Average Energy Purchase Price (NAEPP), while imported units are billed at progressive retail slab tariffs. Because approximately 70% to 75% of residential solar generation is consumed directly during daylight hours (avoiding high peak retail tariffs), typical payback periods remain robust at 2.0 to 2.5 years.

Which battery is recommended for running an inverter AC overnight on solar?

A 48V Lithium Iron Phosphate (LiFePO4) battery bank (minimum 100Ah to 200Ah usable capacity) is strongly recommended. Deep-cycle lead-acid tubular batteries only offer 50% usable depth of discharge and quickly degrade under inductive AC compressor loads within 12 to 18 months, whereas LiFePO4 cells deliver 4,000+ charge cycles at 85% depth of discharge.