MEPCO Solar Calculator: Multan & South Punjab Solar Sizing
Calibrated for Multan Electric Power Company (MEPCO) consumers with high solar insolation (5.3 PSH) and intense ambient summer heat.
Electricity Usage
Enter bill, drag slider, or tap a quick preset
Rooftop Structure Type
Grid Meter Phase
Night AC Battery Storage
Run inverter AC during night loadshedding
Recommended System Architecture
Calibrated for Tier-1 580W N-Type Bifacial TOPCon Modules
Optimal for continuous AC loads. 4,000+ deep cycle lifespan (approx. 10 years).
Financial Returns & Net-Billing Payback
2026 NEPRA MODELIf hybrid storage exceeds your upfront budget, install a smaller daytime system without night batteries:
*Skips expensive batteries. Runs your household and ACs on solar during the day, dropping your grid consumption below 200 units to qualify for base tariff slabs.
Contractor Quotation Validator
Have a quote from a local installer? Verify if you're being overcharged.
High Solar Insolation & Temperature Management in South Punjab
South Punjab receives exceptional solar radiation, making solar systems highly productive. However, proper rear ventilation and elevated mounting are essential to dissipate extreme summer heat build-up under the panels.
Explore Regional DISCOs
Explore Solar Sizing Guides & Cost Breakdowns (Pakistan 2026)
Detailed engineering specs, monthly unit yields, 580W panel counts, and turnkey cost breakdowns by system capacity:
5–6 Marla homes running fans, lights, fridge, & 1 inverter AC. ~350–420 units/mo.
10 Marla homes running 2 Inverter ACs + household load. ~600–750 units/mo.
1 Kanal residences with 3–4 ACs & net-metering. ~1,250–1,500 units/mo.
Commercial plazas, schools, clinics, & large joint families. ~2,000–3,000+ units/mo.
Frequently Asked Questions (Solar Sizing & NEPRA Tariffs)
How does extreme heat in Multan affect solar panels?
High ambient temperatures (45°C+) cause solar panel voltage to decrease by approx 0.30% per °C above 25°C. Using modern N-Type TOPCon panels with lower temperature coefficients (-0.29%/°C) minimizes heat loss in South Punjab.
What is MEPCO's net-metering procedure in Multan?
MEPCO processes net-metering through its sub-divisional offices with demand notices issued for 3-phase electronic bidirectional meters.
What is the solar payback period in MEPCO region?
Due to 5.3 Peak Sun Hours and high cooling loads, typical payback in Multan and Bahawalpur is among the fastest in Pakistan at 1.9 to 2.2 years.