LESCO Solar Calculator & Lahore Net-Billing Payback Guide
Customized for Lahore Electric Supply Company (LESCO) consumers, accounting for summer peak heat and winter smog solar derating.
Electricity Usage
Enter bill, drag slider, or tap a quick preset
Rooftop Structure Type
Grid Meter Phase
Night AC Battery Storage
Run inverter AC during night loadshedding
Recommended System Architecture
Calibrated for Tier-1 580W N-Type Bifacial TOPCon Modules
Optimal for continuous AC loads. 4,000+ deep cycle lifespan (approx. 10 years).
Financial Returns & Net-Billing Payback
2026 NEPRA MODELIf hybrid storage exceeds your upfront budget, install a smaller daytime system without night batteries:
*Skips expensive batteries. Runs your household and ACs on solar during the day, dropping your grid consumption below 200 units to qualify for base tariff slabs.
Contractor Quotation Validator
Have a quote from a local installer? Verify if you're being overcharged.
LESCO Solar Engineering & Smog Resilience in Lahore
Lahore features intense solar irradiance during summer (5.0 PSH), which perfectly matches peak air conditioning demand. Sizing a system under LESCO requires careful attention to rooftop pergola elevation to clear terrace parapets and smog dust cleaning protocols.
Explore Neighboring Punjab Utility Calculators
Explore Solar Sizing Guides & Cost Breakdowns (Pakistan 2026)
Detailed engineering specs, monthly unit yields, 580W panel counts, and turnkey cost breakdowns by system capacity:
5–6 Marla homes running fans, lights, fridge, & 1 inverter AC. ~350–420 units/mo.
10 Marla homes running 2 Inverter ACs + household load. ~600–750 units/mo.
1 Kanal residences with 3–4 ACs & net-metering. ~1,250–1,500 units/mo.
Commercial plazas, schools, clinics, & large joint families. ~2,000–3,000+ units/mo.
Frequently Asked Questions (Solar Sizing & NEPRA Tariffs)
How does winter smog in Lahore affect solar generation?
Winter smog in Lahore can reduce solar generation by up to 45% between November and January. Our calculator factors in a 0.78 derating factor and recommends proper tilt angle (28°-30°) for winter clearance.
What are the steps for LESCO net-metering approval?
The process involves submitting an AEDB-certified engineer dossier, obtaining a DISCO NOC, paying the bidirectional meter demand notice, and completing the electrical inspection.
Is solar profitable in Lahore under LESCO net-billing?
Yes. Because residential tariffs in LESCO reach up to Rs. 48/unit in peak summer slabs, self-consuming solar energy saves substantial money, delivering a payback of 2.0 to 2.4 years.